| Year | Project | Customer | Services | Description | 
| 1996 | Solids handling and dosing | ABB Umwelttechnik, Butzbach | 
  | 
        Technical consulting and support for limestone powder conveying and -injection into the absorber Melnik 1 (CR) | 
| 1997 | Fluidized bed combustion systems | L. & C. Steinmüller, Gummersbach | 
  | 
        Conceptual design, calculation, design and basic engineering quotation for a power station (lignite coal, fluidized bed combustion) upgrade/uprate concerning coal handling, direct desulphurization and deashing, power station Javorzno (Poland) | 
| 1997 | Pneumatic Ash conveying | L. & C. Steinmüller, Gummersbach | 
  | 
        Conceptual design, calculation, design and basic engineering quotation for a new power station (4x350 MWel) at Elbistan (Turkey), concerning fly and coarse ash handling as well as vapour ESP coal handling | 
| 1997 | Solids handling and dosing | HKW Afferde | 
  | 
        Optimizing of dosing and injection of waste wood into a boiler with fluidised bed combustion, power station Afferde (Hameln, Germany) afterwards retrofitting of 5 lines with the same equipment | 
| 1997 | Solids handling and dosing | Konsortium Steinmüller/Babcock/ VKR/Saarberg/Lurgi  | 
        
  | 
        Engineering (calculation and design) for the coal dust handling for a pressurized coal dust combustion, Test installation Dorsten | 
| 1997 | Fluidized bed combustion systems | L. & C. Steinmüller, Gummersbach | 
  | 
        start-up supervision of a 100 MWth fluidized bed power station at Tosa (Japan) | 
| 1998 | Pneumatic Ash conveying | WSW Energie und Wasser AG (Wuppertaler Stadtwerke), HKW Wuppertal-Elberfeld | 
  | 
        Conceptual design, engineering, delivery and commissioning of a pneumatic conveying plant for hot deashing (max 500°C, 2 x 6 t/h) of the fluidized bed cooler of the fluidized bed boiler, power plant Elberfeld, Wuppertal (Germany) | 
| 1999 | Pneumatic conveying of coal | L. & C. Steinmüller, Gummersbach | 
  | 
        study about different kinds of dosing and pneumatic conveying technics for using in a hard coal dust firing plant, power plant remounting Smijew (Ukraine) | 
| 1999 | Flue gas cleaning | S.S.T. Schüttguttechnik GmbH, Landsberg/Lech | 
  | 
        study / measurement / consulting concerning additive conveyor system for flue gas cleaning KNT (Klausner-Nordic-Timper) in Wismar and Kirchmöser | 
| 2000 | Dust collection | AE&E Austria | 
  | 
        Study and inspection of the separation process in a multicyclone vessel | 
| 2001 | Anhydride conveying | Rocal Boxberg GmbH & Co.KG, Boxberg | 
  | 
        Inspection and measurement of the best possible condition for conveying hydrated AN, therefor optimising the system. | 
| 2001 | Processed animal product | STEAG AG, Essen, Heizkraftwerk Herne | 
  | 
        Optimizing of plant; specifications and supply of a four way distributor (from DN 100 to 4xDN80)(manifold) for an animal processing direct firing system, also with by-pass air connection; optimisation of the processed animal incineration plant | 
| 2001 | Pneumatic Ash conveying | RWE Power AG, KW Neurath | 
  | 
        Ash removal boiler in block D, Neurath power station. Engineering and installation to convert the existing conveying line. | 
| 2002 | Processed animal product | WSW Energie und Wasser AG (Wuppertaler Stadtwerke), HKW Wuppertal-Elberfeld | 
  | 
        Engineering as well as component lay out ( silo, conveying componentry and various pipelines), instillation and commissioning of an animal processing plant conveying system with changeable componentry to a processed animal incineration plant. utilising: rotary airlock, injector, blower and a control valves. | 
| 2003 | Pneumatic conveying | Simatek A/S, Dänemark | 
  | 
        Supply of DN 80 ejectors with ceramic diffusorsand non return valves, for the conveying of waste material from a waste incinerator | 
| 2003 | Hydrated lime conveyance | W. Kurz & Söhne, Stahl- und Behälterbau, Brackenheim | 
  | 
        Supply of ejectors DN 50 and DN 80 with a special diffuser and components including drawings of injection nozzles and the delivery of a four way distributor (from DN 50 to 4xDN32). | 
| 2004 | Hydrated lime conveyance | Gemeinschaftskraftwerk Schweinfurt GmbH (GKS), Schweinfurt | 
  | 
        Research for lime dosing and waste product transport | 
| 2004 | Lime stone conveyance | Anlagenbau Flunkert, Bergheim | 
  | 
        Engineering for a conveying line, conveying fine lime stone (GKS Mannheim), delivery of ejectors, rotary blower and dosing unit. | 
| 2004 | Pneumatic conveying of coal | RWE Power AG, Cost Center Fabrik, Service, Bergheim (Fabrik Fortuna Nord) | 
  | 
        Developement, technical process design, layout and construction details for a water jet pump for suction conveying, to be operated in a purging system for brown coal dust | 
| 2005 | Pneumatic Ash conveying | EnBw AG, Stuttgart, RMHK Münster | 
  | 
        Consulting and documentation of a pressure conveyong vessel | 
| 2006 | Pneumatic Ash conveying | RWE Power AG, KW Weisweiler | 
  | 
        Engineering for the combustion of additional material (layout of the conveying system for waste material and basic and detailed engineering of the conveying pipeline). | 
| 2006 | Injection technology | Horsthemke GmbH, Beckum | 
  | 
        Pneumatic conveying of boiler ash "Project Rüdersdorf": Layout and basic engineering | 
| 2006 | Brown coal dosing | Schwedes+Schulze Schüttguttechnik GmbH, Wolfenbüttel | 
  | 
        Process and technical layout for a pneumatic conveying pipeline | 
| 2006 | Pneumatic conveying | Steinmüller Engineering GmbH, Gummersbach | 
  | 
        Basic engineering project (Tabor CZ) | 
| 2006 | Pneumatic Ash conveying | Anlagenbau Flunkert, Bergheim | 
  | 
        Basic engineering and supply (pressure vessel conveyor) for the conveying of fly ash at GKM (powerstation in Mannheim) | 
| 2007 | Pneumatic conveying | Steinmüller Engineering GmbH, Gummersbach | 
  | 
        Basic-Engineering for the project "ash-handling", Lünen and Mainz | 
| 2007 | Pneumatic conveying | Steinmüller Engineering GmbH, Gummersbach | 
  | 
        Consulting and engineering for the project "tried brown coal", RWE | 
| 2007 | Processed animal product | WSW Energie und Wasser AG (Wuppertaler Stadtwerke), HKW Wuppertal-Elberfeld | 
  | 
        Technical planing and preparation of licensing procedure for designing and operating of a co-combustion plant | 
| 2008 | Pneumatic Ash conveying | EnBw AG, Stuttgart, RMHK Münster | 
  | 
        Basic-Engineering and optimazation of ash-handling plant | 
| 2008 | Pneumatic Ash conveying | HEC GmbH, KW Bergkamen | 
  | 
        Pneumatic conveying of boiler ash and basic-engineering, calcualtion and bidders evaluation | 
| 2008 | Pneumatic conveying of coal | RWE Power AG, KW Wachtberg | 
  | 
        Preliminary calculation and sizing of conveying pipes for wood chips. | 
| 2009 | Pneumatic Ash conveying | CKD Praha Diz, TP Tabor, CZ | 
  | 
        Consulting on-site | 
| 2009 | Coal, solids handling and dosing | Steinmüller Engineering GmbH, Gummersbach | 
  | 
        Basic-Engineering for safety storage and drying of lignite-coal (IHI-project) | 
| 2009 | Hydrated lime conveyance | HELLMICH GmbH & Co. KG | 
  | 
        Basic-engineering and troubleshooting for flue gas treatment plan (HOK) and clciumhydroxide | 
| 2010 | Pneumatic conveying | E.ON New Build & Technology GmbH, Gelsenkirchen | 
  | 
        Engineering: De-ashing Power Plant in Russia | 
| 2011 | Coal, solids handling and dosing | Steinmüller Engineering GmbH, Gummersbach | 
  | 
        Engineering: Concept for co-combustion of biomass/Eskom, South-Africa | 
| 2011 | Coal, solids handling and dosing | Fisia Babcok Environmental GmbH, Gummersbach | 
  | 
        Troubleshooting de-ashing E-Filter, Power Plant Neurath | 
| 2012 | Solids handling and dosing | Heizkraftwerksgesellschaft Cottbus mbH, Cottbus | 
  | 
        Delivery of ejector DN80 | 
| 2012 | Pneumatic Ash conveying | EnBw AG, Stuttgart, RMHK Münster | 
  | 
        Pneumatic ash removal for coal-fired boiler K25 in power plant Stgt.-Münster + tech.request for proposal | 
| 2012 | Pressure vessel conveyor | Pressure vessel conveyor | 
  | 
        Feasibility study: Optimization of ash loading | 
| 2012 | Pneumatic Ash conveying | Hamon Environmental GmbH, Köln | 
  | 
        expert opinion about pneumatic dust removal from an electric filter | 
| 2013 | Hydrated lime conveyance | Schaub Umwelttechnik, Augsburg | 
  | 
        Assessment of pneumatic transport plant in Zorbau and delivery of ejector DN 100 | 
| 2013 | Coal, solids handling and dosing | Steinmüller Engineering GmbH, Gummersbach | 
  | 
        Engineering fluized bed combustion | 
| 2013 | Injection technology | Doosan Lentjes GmbH, Ratingen | 
  | 
        Delivery of splitter and hoses | 
| 2013/2014 | Pneumatic Ash conveying | Hamon Environmental GmbH, Köln | 
  | 
        Engineering for instrumentation and valves for ESP, O-MON-Vietnam | 
| 2014 | Cyclon | RWE PowerAG, Niederaußem | 
  | 
        Engineering Pre-Separator | 
| 2014 | Pneumatic Ash conveying | (RWE Power AG) RV Handel und Dienstleistungen GmbH, Frechen | 
  | 
        Optimization of lime stone conveying | 
| 2015 | Pneumatic Ash conveying | Andritz Energy & Environ-ment GmbH, Raaba, Austria | Examination of Lean phase conveying | |
| 2015 | Coal injection | AIR LIQUIDE Forschung und Entwicklung GmbH, Frankfurt | 
  | 
        Analysis of the solid-gas-circulation by pyrolysis of biomass | 
| 2015 | Pneumatic Ash conveying | Hamon Research-Cottrell GmbH, Köln | 
  | 
        Expertise concerning filterdust quality | 
| 2015 | Pneumatic Ash conveying | RWE Power AG, KW Neurath | 
  | 
        Supply of spare parts: Special diffusor (Al2O3) DN150 | 
2016  | 
        Environmental engineering | IEM FörderTechnik GmbH,Kastl | 
  | 
        Analysis of activated carbon | 
| 2016 | Coal injection | OERLIKON Schweißtechnik GmbH, Eisenberg | 
  | 
        Delivery of ejector DN80 and blower | 
| 2016 | Pneumatic Ash conveying | Loibl (Allen Sherman-Hoff GmbH), Straubing | 
  | 
        Engineering Project Turow: Design of pneumatic conveying system | 
| 2016 | Pneumatic conveying | Förder- und Anlagentechnik GmbH, Niederfischbach | 
  | 
        Calculation of pressure loss | 
| 2016 | Coal injection | OERLIKON Schweißtechnik GmbH, Eisenberg | 
  | 
        Delivery of an ejector DN80 with ceramic diffuser | 
2016  | 
        Fluidized bed combustion systems | L. & C. Steinmüller, Gummersbach | 
  | 
        Study: Waer in pneumatic conveying systems | 
| 2017 | Pneumatic Ash conveying | Hamon Research-Cottrell GmbH, Werk Dobrawa | 
  | 
        Delivery of 4 6-way-splitter (dilute phase) | 